egl_lrt_west_jul_2013.jpg 

Eglinton Crosstown LRT Western Tunnel
Client:  Metrolinx / TTC
Prime Consultant:  Transit City Group (IBI Group, AECOM)
Value:  $319.7 million
 

The project involves the construction of a 6.5km long, twin-bored tunnel running beneath Eglinton Avenue from Black Creek Station to the Yonge Street Station located in Toronto, Ontario. This project is part of an $8.5B transit expansion program to install a Light Rail Transit system from Black Creek Drive to Scarborough Town Center. The tunnels will be constructed using earth pressure balance (EPB) tunnel boring machines and pre-cast tunnel lining segments. The internal diameter of the tunnels will be 5.75m.

Kenaidan built the launch shaft for the TBM's under a separate contract awarded to KO Constructors, (a joint venture of Kenaidan Contracting Ltd. and Obayashi Canada Ltd.).